As a ship is loaded it sinks deeper into the water, displacing an additional amount of water equal to the weight of the added load.
当船装了货,吃水就深些,排开的水量即等于所加负荷的重量。
This added "toxic load" places additional stress on the body.
这些“有毒负载”额外增加了身体的负担。
During peak load times, more instances are added to the cluster and when the load comes down, the number of instances comes down.
在负载峰值期间,集群会增加更多的实例,而当负载下降时,实例的数量也会下降。
应用推荐