... 调车作业计划 shunting operation plan 快速作业计划 active schedule 生产作业计划 production operational schedule ...
基于1个网页-相关网页
Semi-active Schedule 半能动作业计划
Non-active schedule 非能动作业计划
Link Active Schedule 活动链接调度器 ; 由活动链接调度器 ; 链接调度器
Situations always arise where an interface is unavailable because it needs a patch to resolve an issue, or developers must schedule downtime to work with an interface within an active testing window.
以下的情况经常会出现:接口不可用,因为需要使用补丁修复错误;或者开发人员必须安排宕机时间来处理活动测试窗口中的接口。
In other words, the more tasks (n) are active, the longer it takes to schedule a task.
换而言之,活动的任务越多,调度任务所花费的时间越长。
So it requires frequent spraying while the bugs are active (this is usually while I\\\\\\\\\\\\\\\'m at the office, as the bugs and I follow the same schedule).
所以这就需要高频的喷洒,尤其是虫子活跃的时候(这又常常是我在办公室的时候,因为我和虫子们有着同样的作息时间表)。
应用推荐