As the role of the master builder narrowed to that of a designer the general contractor took over construction.
由于营造师的作用缩小到设计师的作用,因而总承包人就把施工任务接手过来。
Master Huang: There's a lot of construction in this area right now, it's hard to find good workers at the moment.
黄师父:这个区域有好些建筑地盘,现在很难找到工人。
The club is a two-story horizontally developed construction with its first floor equipped with spa, kitchen, stores and Caddy master while the second floor cafe, restaurant and meeting room.
一层为洗浴及桑拿设施和厨房、商店与出发台等配套设施;二层为咖啡厅及开敞餐厅与会议室等。
应用推荐