the YRDP 引黄联接段
Wanjiazhai YRDP 万家寨引黄工程
north trunk of YRDP 引黄北干
Archives Work for YRDP 万家寨引黄工程档案管理工作初探
Zuncun Irrigated Area of YRDP 尊村引黄灌区
first-stage construction of YRDP 引黄一期工程
YRDP Information Acquisition System 水质信息采集系统
In this paper, the construction experience of PCCP in the Connection Works of YRDP is summarized.
文中总结了万家寨引黄联接段工程中的PCCP管道施工经验。
The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed.
文中针对万家寨引黄工程输水隧洞及泵站平洞竖井存在的渗漏原因进行分析研究。
In the paper, the construction technology of buried culvert in No. 2 tunnel in Wanjiazhai YRDP using well-point to discharge ground water, is adopted.
文中介绍了万家寨引黄工程南干线2号埋涵的施工方法,采用了“井点法”排除地下水。