ABBREVIATION for Atomic Energy of Canada Limited 加拿大原子能公司
As long as AECL was working on two replacement reactors, American processing firms were content to wait.
只要加拿大核能公司继续开发两个替代反应堆,美国加工公司就愿意等待。
According to AECL, uncertainty about the cost of solving the PCR problem was a key factor in the project being scrapped.
据AECL透露,解决P CR问题的费用无法确定是这一项目被取消的关键原因。
So in 1996, Ottawa-based isotope wholesaler MDS Nordion hired AECL to design, construct and run two new reactors and a processing facility.
于是,在1996年,渥太华的同位素批发商MDS Nordion公司请AESL设计、兴建并经营两座新的反应堆和一台处理设备。
应用推荐