甲方或其他审批单位对设计文件不审批或本合同项目暂停缓建,甲方均应支付应付的设计费。
In case the Party a or other approval units would not approve the design documents or the construction of this Contract is suspended, the Party a should also pay the payable design charges.
我公司是行业安全生产审批单位,现通过并严格按照ISO 9001质量管理体系进行科研、生产。
Our company has passed the trade safety manufacture examination of the approval unit, We strictly accord the ISO9001 QC system at our producing and scientific researching.
与其让各个省开列审批药物、单位、厂商名录以及划定药价,还不如整合资源,与渥太华合作来创立一个全国性的医药代理机构。
Instead of each province having its own list of approved drugs, bureaucracy, procedures and limited bargaining power, all would pool resources, work with Ottawa, and create a national institution.
应用推荐