研究了员工具有异质效率、最小化项目工期的项目调度问题,并建立了相应的整数线性规划模型。
Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
应用推荐