阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。
Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.
这些表与 EJB 有相同的命名,这对于自顶向下映射来说是标准的。
The tables are named the same as the EJBs, as is standard for a top-down mapping.
表1顶部所列出的各种业务模式和集成模式中的每一种模式在满足所讨论的各种业务需求时都有相对的优点与缺点。
Each of the various business and integration patterns listed along the top of Table 1 has its relative strengths and weaknesses when it comes to meeting the various business requirements discussed.
应用推荐