本文对导流隧洞进口围堰堰外引渠水下爆破方案的有关参数和震动监测等进行描述。
The paper described the relational parameters and vibration test of the underwater blasting of guide ditch ahead of water conveyance tunnel.
采用传统的加载力学方法和卸荷力学方法,利用数值计算对紫坪铺水利工程引水发电隧洞进口高边坡开挖后的应力-应变进行了研究。
For the high slope of intake of diversion tunnel of Zipingpu Irrigation Project, the relationships of stress and strain are calculated by traditional mechanical methods of unloading and loading.
应用推荐