本文从影响成本的因素入手,探讨降低工程成本的途径。
This essay is started from factors to effect project cost to investigate ways to reduce cost.
为确保边坡稳定,降低工程成本,采用了预裂爆破技术。
The pre splitting blasting, technical parameter, firing method and blasting effect of the project are introduced.
若要降低工程成本,银行利率必须要低,这反过来又需要降低成本。
To keep project costs down, the bank must offer low rates, which depend in turn upon low capital costs.
应用推荐