本文从铁路牵引供电远动系统的需求入手,对系统的体系结构进行分析和设计。
In this paper, From starting with needs of railway traction power supply system, it analyzed and designed system architecture.
探讨了电气化铁路牵引供电系统接触网施工中安装分段绝缘器存在的问题,并提出了解决措施。
This article talks about existing problems and solution on installation of section insulator in overhead contact net construction.
铁路牵引供电远动系统项目就是基于整合沈阳铁路局管内现有的多个远动系统,实现统一的调度指挥而新开发的系统。
SCADA technology system for railway traction power supply is based on integration of many existing SCADA systems in Shenyang Railway Bureau and achieves unified command.
应用推荐