钢-混凝土组合连续梁桥的中间支座附近为负弯矩区,会导致桥面混凝土开裂,缩短使用寿命。
Negative bending moment nearby the middle supports of composite steel-concrete continuous beam bridge, will cause floor deck concrete to crack and shorten its life.
讨论了钢材的初始挠曲对钢混凝土连续组合梁的极限承载力与失稳屈曲临界荷载的影响。
The influence of initial displacement on load bearing capacity and critical load of steel concrete composite structure is discussed.
海淀公园人行天桥位于北京海淀公园内,其钢-混凝土组合连续梁为双线双曲下承式箱梁。
The pedestrian overbridge of Haidian Park is located in Beijing Haidian Park, whose steel-concrete continous beam is a bifilar and hyperbolic through box beam.
应用推荐