延期 六年 重置财产确实是不合情理。
Six-year delay in replacing the property was really unreasonable.
三是重置与受损标的相同的财产或支付修理费用。
The 3 same property that are replacement and damage award or pay repair charge.
该部分的赔偿基础应该为修复、重置或替换受损财产的全部费用,即使这种费用与原始建造费用不同时也是如此。
The basis of indemnity under this Section shall be the full costs of repairing, reinstating or replacing property lost or damaged, even though such costs may vary from the original construction costs.
应用推荐