5月26日,英国石油公司开始将重型钻探泥浆用泵抽运进防喷装置- - - - -它是由多个气阀构成,位于油井顶部,连接着那根已断裂的立管。
On May 26th BP started to pump heavy drilling mud into the blowout preventer, the set of valves at the top of the well to which that broken pipe is attached.
应当为“深水地平线”钻井台石油泄漏事件负责的BP(英国石油公司)在5月26日开始用泵将重型钻井泥浆打入海底的阀门组(防喷器)中。
On May 26th BP, the company responsible for the well that Deepwater Horizon had drilled, started to pump heavy drilling mud into the well's blowout preventer, a set of valves on the sea floor.
立柱:装有法兰,重型锻钢管包围泵轴。
Shaft Column: Flanged, heavy wrought steel pipe encases the pump shaft.
应用推荐