For a long time, the mining plan is worked out by the traditional manual method, which is inefficient and difficult to ensure the quality.
长期以来,我国矿山采掘计划一直采用传统的手工方法进行编制,其效率低下,也难以保证计划的质量。
参考来源 - 基于神经网络的采掘接替计划专家系统研究·2,447,543篇论文数据,部分数据来源于NoteExpress
矿井采掘计划的编制是典型的不良结构和复杂的技术经济问题。
The draft of coal mine excavation plan is typically an unhealthy structural and complex tech economic problem.
编制采掘计划是处理采掘关系决策的手段,也是其首要的和基础性的工作。
Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production , and is chief and basal work.
本文介绍了完成采掘计划的几点意见,可供从事矿山计划管理及现场管理人员等参考。
This paper introduced several views of fulfilling excavation plan, which can be a reference for mine plan and field management people.