2010年,完成景德镇火电、中卫香山风电等6个项目电缆等通用物资总包配送工作。
In 2010, completed general contracting and delivery of general materials like cable for 6 projects such as Jingdezhen Thermal Power Plant and Zhongwei Xiangshan Wind Farm.
针对战时通用物资保障建立了订购、调配与运输优化模型,旨在探讨如何在保证军事效益的前提下提高保障的经济效益。
Aiming at general materials supply in wartime, the paper establishes the optimized model of order, allocation and transportation in order to increase military economic efficiency.
系统设计充分考虑了通用性,极易移植于其它物资系统。
It can be easily transfered to a system for other materials.
应用推荐