传统的无功优化通常考虑的仅仅是提高电网的电压质量和降低网损,当系统的传输容量有足够的裕度时,这种只考虑经济效益和基本运行约束的做法是适当的。
The general reactive power optimization is only to reduce the loss of the system and improve the quality of voltage, which is suitable when system has enough power capability.
在采用最大相对速度-距离法的基础上,引入模糊逻辑控制时间裕度,使任意两次检测间的时间间隔适当增大。
The theory of maximum relative velocity distance is provided, and the fuzzy logic is used to control the time margin.
应用推荐