为在送电线路铁塔基础中应用此类基础提供了一定的科学依据。
The scientific evidences are provided for applying it to foundations for the power line towers.
为确保纳赤台—五道梁—沱沱河送电线路工程多年冻土地区铁塔基础地基的稳定,部分地段采用了热棒处理措施。
The part area adopts heat-bar treatment measure, to ensure permafrost areas iron tower foundations stability of Nachitai-Wudaoliang-Tuotuohe transmission line engineering.
应用推荐