With system engineering methods and computer simulation technology, the paper develops methods of TBM construction schedule analysis and real-time control for construction schedule which is applied to Xinjiang Bashiyi Daban tunnel construction. The main contents and achievements are as follows:1.
本文采用系统工程方法和计算机仿真技术,开展了输水隧洞TBM施工进度分析与进度实时控制研究。
参考来源 - 输水隧洞TBM施工进度分析与实时控制研究·2,447,543篇论文数据,部分数据来源于NoteExpress
准备在接下来的两个星期在梦幻篮球的比赛预览、进度分析和预测,包括可下载的预测小抄。
Prepare for the next two weeks in fantasy hoops with matchup previews, schedule analysis and more, including a downloadable projections cheat sheet.
并通过施工总进度分析与优化、主要业务流程仿真运行改进,验证了该方法的可行性及实效性。
And the progress of construction through analysis and optimization, simulation run major business process improvement, test the feasibility of the method and effectiveness.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
应用推荐