·2,447,543篇论文数据,部分数据来源于NoteExpress
已建立了现场各级启动运行指挥组织。
All level operation command organization has been established at site.
也许需要运行指挥所改变为事故指挥部。
It may be necessary to change Operation Command Post to Incident Command Post.
RBC系统对实现高速铁路信号系统“运行指挥、安全防护”的功能起着关键作用。
RBC system makes key effect of actualizing the function of "operation commanding, safety protection" in the high-speed railway signaling system.
应用推荐