station operating time
·2,447,543篇论文数据,部分数据来源于NoteExpress
研究结果表明,装车站作业过程的可靠性主要受装车作业时间、机务作业时间的影响。
The study shows that the reliability of the loading station is affected by the time of loading truck and waiting locomotive.
youdao
应用推荐
模块上移
模块下移
不移动