走马岭隧道通过方斗山背斜可溶岩地区,岩溶发育强烈。
Zoumaling tunnel passes through the Fangdoushan anticline where the karst development is strong.
待开发的有走马岭、庐溪峡、铜鼓岩、九峰十二度水等。
To be developed are to go Maling, Cottage Creek Gorge, drums rock, Jiufeng 12-degree water.
走马岭隧道岩体结构特征和围岩稳定性研究,为优化设计参数,提高施工质量提供理论指导,对保证施工安全以及优化设计具有重要工程实践意义。
Study on the characters of rock mass condition and the stability of surrounding rock has great practical significance to optimize design parameter and to advance construction quality.
应用推荐