一旦加载了向导,您就必须指定用itm数据源配置的资源位置(图14)。
Once the wizard is loaded, you must specify a resource location configured using the ITM data source (figure 14).
在使用link元素的情况下,相关信息的对人友好版本与机器可读版本分开放在两个不同的资源位置。
In a scenario that makes use of the link element, the human-friendly and machine-readable versions of the relevant information are found at two different resource locations.
将虚拟映像复制到管理程序后,您可以指定新环境中操作系统所需的CPU和内存的缺省资源位置的任何更改。
After the virtual image is copied to the hypervisor, you can specify any changes to the default resource allocation of CPU and memory required by the operating system in the new environment.
应用推荐