此外,随着大型变电站的负荷增长,变压器的容量也必须增加。
Furthermore, as the load on a large substation grows, transformer capacity has to BE added.
近年来华东电网的电力需求有较快的增长,到2007年最大负荷增长有所放缓。
The electric power demand of East China Power Grid keeps increasing in recent years and the growth of its maximum load was a little bit slower in 2007.
CPU负荷增长尽管(写)事务量没有变写日志个数没有变日志文件同步的往返信号传输时间就会延长。
When the CPU load goes up, the time taken for a log file sync round trip can increase even when the number of log file syncs and the volume of redo log generated doesn't change.