运用计量方法和神经网络原理,构建贷款前的信贷过程风险管理识别和量化体系。
The author USES the measurement method and neural network theory to build the identifying and quantifying system of the credit process risk management before loan.
[摘要]当前对建设项目风险管理的研究,大都从微观着眼,探讨的重点也往往局限于风险指标体系的设立、风险识别的方法、风险量化的工具等。
Abstract: Current research on project risk management usually emphasizes on the setting up of risk index system, the way of risk identification, the tool of risk quantification and so on.
应用推荐