... projected mean length 投影平均长度 projected mine 设计的矿井 projected path(飞行) 预定的轨迹 ...
基于12个网页-相关网页
针对矿井喷浆机器人设计的要求,对机器人大臂端点位置进行运动分析。
Being directed against the demand of the mine guniting robot's design, do the active analysis to the situation of robot's arms end.
从而有利于生产管理和矿井设计选用合理的方案。
It is advantageous to the management of production and selecting reasonable plan in mine design.
介绍了一种实时在线矿井突水监测科氏力质量流量计的设计。
This paper introduces the design of a Coriolis mass flowmeter for the on-line monitoring of water inrush in mine.
应用推荐