无效成果文件的设计机构,主办方将不予支付成本费。
The organizer will not pay the design cost of disqualified design schemes.
各获邀参加的设计机构工作时间为2个月左右,最终设计成果提交时间以正式发布的咨询文件为准。
The invited designers can work for about 2 hours, the final design results shall be submitted at the time stipulated in official consultation document.
纵断面图是道路纵断面设计的最后成果,也是道路设计的重要文件之一。
Road profile drawing is the find result of road profile design and one of the important documents for road designing.
应用推荐