庞大的建设量导致设计周期的缩短。
The large construction amounts shorten the designing time cycle.
这些法律使报废成本直接叠加到设计周期的最前沿。
These laws bring the end-of-life costs directly to the forefront of the design cycle.
在设计周期的早期努力与可获得的支持人员建立联系。
Make an effort to establish a relationship with available support personnel early in the design cycle.
应用推荐