当考虑到发电机报价曲线的影响时,发电计划偏差优化问题是一个高维、离散、约束条件复杂的非线性最优化问题。
Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.
采用计划和跟踪管理方法,并且超出进度来计算偏差,或者。
Adopting a plan-and-track governance method and moving out the schedule to account for the variance, or.
超短期负荷预测结果与原有的发电计划之间难免出现偏差。
The deviation between ultra short term-load forecast and the original generation plan is unavoidable.