确认并解决生产过程中出现的相关技术问题。
Identify and solve all production and technical issues relating to the manufacturing.
结构的配置工作不仅要解决必然的技术问题,同样也需要综合考虑表现性等相关议题。
Structural configuration is not only necessary to solve the technical problem, but also needed to synthetically consider other issues such as expressivity.
要解决这些关键气动力问题,必须进行一系列相关的大型高速风洞试验,以及解决相应的试验技术问题。
To solve these key problems, it is essential to carry out high speed wind tunnel tests and deal with testing technical problems thereof.
应用推荐