装置验收有可能在下文所述的任何一个里程碑发生。
Acceptance Of The Plant may occur at any milestones as described hereafter.
同时,根据该试验验收过程提出了南水北调工程中泵站装置验收需要考虑的若干建议,供其它类似泵站试验验收参考。
As reference, some Suggestions are put forward for the model acceptance tests in the South-to-North Water Project to be similar with this pumping station.
接地装置属隐蔽工程,设计、施工、验收各环节均需严格规范,对此进行了阐述和分析。
Analyzes the normalization of grounding installation project from design, construction and inspection, assures project quality.
应用推荐