... control objectives 控制目标 control of horizontal synchronization 行同步控制 control of vertical synchronizing 场同步控制 ...
基于104个网页-相关网页
病床由恒动装置驱动,并且通过电脑进行同步控制。
The beds are animated with permanent movements, set and synchronized through a computer.
该方法将两个需要进行同步控制的执行机构,一个作为主系统,另一个视为其观测器。
This method needs two to undertake the actuator of synchro control, one is made give priority to a system, another regards his as observation implement.
由于网络状态的变化给传输带来延迟抖动,因此接收方要如实地播放,就必须进行同步控制,以恢复数据之间的时间关系。
Varieties of net conditions bring transmission delay jitter. The receiver must take synchronization control to resume time relation of stream before playing them according to the facts.
应用推荐