控制棒落棒时间是保证核电站安全运行的重要参数之一。
The drop-time of control assembly is one of the most important parameters to ensure safe operation of Nuclear Power Plant.
通过数值计算,分析了上置式水力驱动控制棒的落棒时间。
The time of dropping rod was analysed by numerical simulation.
测量结果表明,包括落棒时间在内的各种性能参数均满足试验要求。
The result of measurement proves that the drop property parameters meet the requirements of the design specification for Control Rod Drive Line.
应用推荐