相邻网垫组的上下四角以绑扎丝衔接;
The adjacent mat group on four corners by binding wire connection;
第一步,隔板与网身应呈90度相交,用绑扎绑成构成长方形或正方形网垫。
The first step, the partition and the net should be a 90 degree intersection, with the binding ties constitute a rectangular or square mat.
主要为水堤,斜坡六角网格宾网垫和其他抗侵蚀结构海曼,灵活的,适应性优势的基础。
The main water embankment, slope Angle of six mesh gabion mesh pad and other anti erosion structure of Hayman, flexible, adaptive advantage foundation.
应用推荐