为此可在进口溜槽中安装折流挡板或缓冲腔来加以克服。
This could be the baffle or buffer chamber mounted on the inlet chute to overcome.
前挡板与推杆形成一体,而齿条则侧设于推杆边,且前挡板与齿条相接位置设有一缓冲槽,使前挡板受推挤时可呈定距之缓冲位移;
The shift device is arranged on an assembly fixed plate. The shift device is composed of a front baffle plate, a push rod, a rack, and a tail seat.
应用推荐