岩溶隧道; 地质超前预报; 破译技术; 综合成果图;
Karst tunnel; Advanced geological forecast; Interpretation technology; Comprehensive result map;
对以上问题进行详细分析,并提出施工期综合地质超前预报技术方案和相应的施工建议。
Analysis of these issues was done in detail, the comprehensive geological prediction technology in construction period and the corresponding contingency plans for construction were proposed.
在隧道施工过程中,往往会综合使用多种超前地质预报方法。
Various advanced forecast methods are used during tunnel construction. Every method has plenty of original data.
应用推荐