为设计求解该问题的分支定界算法,建立了非线性整数规划模型。
To develop a branch and bound method for this problem, a nonlinear integer-programming model was constructed.
模型中考虑了电厂间相互关联,从而得到含有逻辑表达式的非线性整数规划模型。
The interrelation between the stations is included by the model which is a nonlinear integer programming with logical expression.
建立了面向供应链的多产品、多订单、多时段的订单任务分配的混合整数线性规划模型。
A mixed integer linear programming (MILP) model for orders dispatching in a supply chain with multi-product, multi-order, and multi-period was proposed.
应用推荐