这样就可以解决目标规划中的结构不良的问题和考虑目标函数中的优先等级及右端值等随环境变化的情况。
In this way we can solute ill-structured goal programming problem and think about priority class and the constraint values that are changing with the environment.
矿井采掘计划的编制是典型的不良结构和复杂的技术经济问题。
The draft of coal mine excavation plan is typically an unhealthy structural and complex tech economic problem.
很多组织的情况涉及到结构不良好的问题,即新颖的、不经常发生的、信息模糊的和不完整的问题。
Many organizational situations involve unstructured problems, which are problems that are new or unusual and for which information is ambiguous or incomplete.
应用推荐