提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
结合实例,详细论述了网络分析法在施工中计算工期索赔是一种科学合理的分析方法。
According to the practice example, this paper discusses that network analytical method is a scientific and feasible one to calculate construction period claiming in the course of construction.
索赔是一项业务性很强、基本工作很细的工作,索赔的成功与否直接影响到工程项目标工期和终极本钱。
Claim is that a business be very strong, foundation work very thin of work, claim of success or not direct influence arrive engineering item of work period and end cost.