... operation, multi-protocol 多重协定作业 operation, pipeline 管线作业 operation, transform 变换操作 ...
基于1个网页-相关网页
在进行浮动的海上作业时,节流和压井管线从水下防喷器组出来,之后沿钻井隔水导管外侧面到达水面。
In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface.
在海洋使用浮动船作业时,节流和压井管线是从海底防喷器组直接排出的,之后通过外部的导管到达海平面。
In floating offshore operations, the choke and kill lines exit the subsea BOP stack and run along the outside of the riser to the surface.
在高压试验或处理结束时,必须将处理管线和相关系统内的压力安全地放泄,以使能够继续进行以后阶段的作业。
At the conclusion of high-pressure tests or treatments, the pressure within the treatment lines and associated systems must be bled off safely to enable subsequent phases of the operation to continue.
应用推荐