兄弟们,先看看我们已试模的六个零件吧,还有三个;笔管,笔盖,尾盖,这几天应该能试出。
The first 6 plastic parts mold test, there are three more; barrel, cap and end cap should be ready by these few days.
看到活塞了吧,还有金属环(会塞入笔馆尾端),你看到的尾塞是第一次试模,还不漂亮。
Now you see the piston, and the metal ring; this parts will insert into the back end of the barrel. the end cap you are seeing the from T1 test shot, not good yet.
应用推荐