但是这些延迟可以为其他团队成员提供机会,他们有了意外的时间稳定并减少基线代码中的缺陷。
But these delays can present opportunities for other team members, who are given unexpected time to stabilize and reduce defects in the baseline code.
例如,一个稳定的构造可以放到推荐的基线列表上,使开发者能够看到他们正在从一个在给定时间上的代码开始工作。
For example, a stable build could be put into the recommended base list, enabling developers to see that they are starting with code that was working at a given time.
精化阶段的主要目标是对系统架构进行基线化,为在构建阶段中的大量设计和实现工作提供一个稳定的基础。
The main goal of the Elaboration phase is to baseline the architecture of the system to provide a stable basis for the bulk of the design and implementation effort in the Construction phase.
应用推荐