高级别的设计用来模拟确认设备操作。
The high-level design is then simulated to confirm device operation.
跟踪设备安装调试及时反馈问题点,收集设备资料,确认设备电气资料的完整并及时归档。
Follow up the equipment installation & commissioning, feedback problems in time, collect equipment information and confirm the integrity of electric information and file up in time.
该地区缺乏确认易流行疾病的实验室能力和一定库存的应急药品和设备。
The region lacks laboratory capacity for confirmation of epidemic-prone diseases and stockpiling of emergency medicines and equipment.
应用推荐