为最大限度回收矿产资源和提高矿柱回收率提供一定的理论依据,对类似矿山矿柱回收具有一定的借鉴作用。
It helps to the maximum recovery of mineral resources. It is useful for the similar pillar stoping in other mines.
本文探讨了浅孔留矿祛新型变形方案:留矿全面法、静态留矿法、削壁留矿法,以及这些方法的矿岩开采条件,采场主动支护,矿柱回收等。
The paper discusses the new options of short-hole shrinkage: all-over mining, static shrinkage, precipice shrinkage, rock mining conditions, active supporting and ore pillar recovery.
采场的顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕后,一次性进行回收。
The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.
应用推荐