分析了《石油和天然气工程设计防火规范》(GB 50183 - 93)中安全距离的计算方法,提出了另外一种计算方法。
Analysing the computing method of safety distance in the "Specification of Fire Preventation in Oil and Gas Engineering Design" (GB 50183-93), a computing method is put forward.
工作内容:石油工程师与科学家及其他专家一道寻求开采石油和天然气的最有效方式。
What they do: Petroleum engineers work with scientists and other specialists to drill for oil and natural gas using the most efficient methods possible.
石油公司BP负责人说,静态封杀是一项两期工程的第一步,工程将包括在油井管道中注入水泥,封堵原油和天然气的泄漏。
BP officials say the static kill is the first step in a two-part operation that involves filling the well pipe with cement to block the release of oil and natural gas.
应用推荐