... drainage divide ==> 分水脊,分水界,分水岭,分水线,地面分水岭,流域分界线 drainage duct ==> 疏水管 drainage facility ==> 排水设施 ...
基于28个网页-相关网页
打开密封的地下水疏水管道人孔以试图定位进入系统的氚源。
Opening sealed subsurface drain line manways to attempt to localize the source of tritium into the system.
在吸收塔进口和出口形成的凝结水通过相应的疏水管道导回吸收塔内。
The condensate, which may form in the inlet and outlet of the absorber are led back into the absorber by corresponding piping.
排污管、放水管或疏水管应分别连接到各自的总管上,每管均应串接两个阀门,两阀门间的管段应尽量缩短。
Waste draining pipe, offlet or drain pipe should be connected to the main pipe; each pipe should connect two valves with the most possible short valve-to-valve pipe length.
应用推荐