箱梁的预制是钢筋混凝土斜拉桥施工中的重要环节,它直接影响到主桥施工的吊装进度和拼装精度。
To prefabricate box-girder is important in concrete cable-stayed bridge construction, it affects directly the main bridge construction of assembly progress and packing accuracy.
大型预制预应力混凝土箱梁架设中不同工况下的梁体应力满足设计要求是箱梁安全架设的关键。
The stress under different working modes is the key to the safe problem when erecting long span prestressed concrete box beam.
应用推荐