在高速公路路面和箱涵布置大量监测点,重点对路面位移和箱涵顶进姿态进行监测。
Systematic monitoring work is arranged for the project, the deformation on expressway and the box posture control are focused on the whole jacking process.
对箱涵顶进过程中箱涵本身和周边环境的监测信息进行深入分析,可为今后类似工程提供借鉴。
By analysing the monitoring information of the box and the surrounding environment, some reference can be achieved in similar projects in the future.
涵顶垂直土压力系数随回填土高度的变化为先增后减的趋势; 填土中最大位移点随填土高度而变等。
The result involves the earth pressure on the top of culvert, the lateral earth pressure and the displacement of the earth with the different height of backfill.
应用推荐