C70高强混凝土剪力墙浇筑工艺的足尺试验研究-建筑结构 关键词]高强混凝土;浇筑工艺;浮浆;温度;裂缝 [gap=1203]Keywords:high strength concrete; pouring techniques; laitance; temperature; crack
基于306个网页-相关网页
基面上的积垢、浮浆、脱模剂、油污、装饰物、尘土等脏杂物必须设法清理干净。
The base surface fouling, floating pulp, release agents, oil, decorative objects, dust, dirt and other debris must try to clean up.
每一振点的振捣延续时间应使混凝土表面呈现浮浆和不再沉落为止,约20 ~ 30s。
For every vibrating point, the vibration shall go on till free mortar appears on the concrete surface and not sinks any more, normally 20 ~ 30s.
施工方法,采用专用设备对混 凝土桥面板表面浮浆进行铣刨、拉毛或凿毛、清扫、吹净处理;
Its synchronous construction process includes milling and planing the concrete bridge surface to roughen, cleaning and blasting with special apparatus;
应用推荐