复验安装定位所用的轴线控制点和测量标高使用的水准点。
Roof released elevation of the line of control and the loading axis auxiliary line.
安装定位模板及螺栓时,由公司测量班投设基础轴线及控制标高,然后以此为准进行安装。
Before installing the positioning forms and bolts, the measurement team shall first set the basic axes lines and control levels, based on which installation is to be proceeded.
利用水准测量,在两侧指示桩上用明显标记标出,水泥稳定碎石的铺筑设计标高。
Use level survey to mark the paving design elevation of the cement stabilized macadam with obvious mark on indication piles both sides.
应用推荐